Home Creators Posts Import Register Favorites Logout

Content

Thanks to DIY500AMP.com I have what are supposed to be production Tenpower 60XG’s.

These were manufactured** on July 31, 2026 and that makes them two months newer than the May 2026-dated 60XG’s I tested in mid-July.

You’re probably wondering why there’s no CCC*** mark if they are supposed to be mass production (MP) cells?

At a certain point the pre-production (PP) cells are said to be ready for production. This finalizes the chemistry and construction of the cell. Then pilot production starts to assess and certify the assembly line. They look at cell consistency, quality, and the final yield (how many cells can be sold as high grade). Once the production line is “dialed in” then MP can ramp up to full.

MP cells should be the same as the last release of PP cells, perhaps with tiny tweaks to support creating higher yields. This means that PP cells that have no CCC mark can be the same as CCC-marked MP cells.

And the transition from non-CCC wraps to CCC-marked wraps might not coincide perfectly with the first new MP cells off the certified full production line. They might continue to use up the old wraps first to save money and avoid waste.

We’ll never know when these cell and/or wrap transitions might be made. All we can do is test what are said to be PP samples and then occasionally retest what are said to be MP cells. So far there has been very little difference. And when there is it’s almost always a good change as tweaks are made to the cell and or production line.

My first retest of the 60XG will start soon. 🙂

**The date code on the wrap and the box is July 31, 2026 but I believe that only tells us when they were packaged. We don’t know when they were actually made and put into storage before being shipped. I’ll be sticking with calling the wrap/box date the manufacture date though for all cells since we can never know their actual manufacture date. Even more confusing is what actually is the manufacture date…when it was first charged (as part of the formation process) or after aging and then testing+grade sorting?

**China Compulsory Certification, additional testing now required for all cells made or sold in China after August 1, 2024. The logo (or “CCC”) and certain information must be put on all cells once they are certified. This typically won’t be done by a manufacturer until the cell is ready to go into full production. A manufacturer can apply for an export-only exemption from CCC testing though if the cells will only be sold outside of China (or for engineering/evaluation samples) so lack of a CCC logo does not guarantee that the cells are pre-production. They could be production-ready cells that were tested and have passed and newer cells will have the new CCC marked wraps.

Files

Comments

Ryan

Sorry it's unrelated mooch - any sniffs or ideas through the grapevine on Ampace JP25s? They seem to be on Alibaba for Vapcell and obviously Milwaukee have just come out on their event saying their original Samsung 25R/25S 5.0ah 18v packs will be phased out for the tabless pack (which i'm presuming) will be Ampace 2500mah tabless cells (JP25). Thanks!

Battery Mooch

No news yet but I’ll sniff around and post if I find anything. Vapcell charges over USD40 for shipping from Alibaba for a pair of cells but maybe they’d be interested in some testing if they sent samples.

Battery Mooch

Ahhh….those cells from Vapcell are LT rewraps. They’ve had lower grade Ampace cells before and large number of JP40 dead cells.

Simon676

Awesome! Hopefully these will have longer cycle life than the PP units as well! :)