Home Creators Posts Import Register Favorites Logout
haven't archived this post yet. have a subscription? use the importer!

Content

As a reminder I work on off time but this will track stuff; A full pre-prod roundup. We have a timeline and a ways to go, a north sort to speak.

Trello: https://trello.com/b/uoAYQKfS/ninas-leap-project-board

Game Design Document: https://docs.google.com/document/d/1rb4codzy0glkuhNwNOo7GBDmFKA8WhvsQISA-4_68sc

Timeline: https://docs.google.com/document/d/1dws0QLZB08fpSKMOjgcgun16_7c6d1NihQbmnGp0odQ 

Game Loop: [in images]

Credits: https://docs.google.com/document/d/1ZeTjo5toFzmoSmrvqxwJSHvFmsVIdjMXQeg7Z_Ujoc0/edit#heading=h.24aceerfrv38 tracking

Also a list of ALL polls: https://docs.google.com/document/d/1LY4Q3qnWvhvwth5MF49IwSOdWbuLB7jKqmcmaDJ8G8U/


Link Hub Reminder:

  • Ensure easy access to this central resource.
  • Regularly check the link hub for updates and reference materials.


GDD Update V2:

  • Incorporated additional detailed content into the GDD.
  • Improved clarity and structure within the document.
  • Aimed to provide more comprehensive guidance for developers.
  • Facilitated better alignment of game design with project objectives.

Game Loop Enhancement:

  • Introduced a new tutorial trigger within the game loop.
  • Designed to improve player engagement and comprehension.
  • Aims to provide a smoother onboarding experience for players.
  • Enhances the overall gameplay by integrating educational elements seamlessly.

Trello Overhaul:

  • Conducted a thorough evaluation and reorganisation of Trello tasks.
  • Prioritised tasks to align more closely with current project goals.
  • Removed 30 tasks that no longer fit the project direction.
  • I added approximately 40 new tasks to focus on pressing needs.
  • Transitioned from V1 to a more targeted and organised task structure.
  • Updated the timeline to reflect these changes and focus on task readiness.

Updated Timeline:

  • Rewrite the timeline from March to December to mirror the Trello updates.
  • Provides a detailed and updated roadmap for the project.
  • Reflects the new prioritisation and task structuring in Trello.
  • Aims to ensure all team members are aligned with the revised project schedule.
  • Enhances clarity on deliverables and deadlines for the upcoming months.


Files

Previews only

Comments

No comments found for this post.