Home Creators Posts Import Register Favorites Logout

Content

Look out for a livestream later today, just about to watch the start of the flooding.

Files

Comments

Daniel Freedman

Giving features a dry run? My coat? Thank you!

Rob Smith

Just waiting for the comments to come flooding in..... Oy, that's my coat

Ed Harding

It will be interesting. Looking forward to see how they do it.

Peter Navarch

How they have done it (so far) and how they are doing it. As Assistant Naval Architect for around 10 years at Cockatoo Island, Sydney, I prepared many docking and slipping arrangements. What they have done here is prepare the blocks for the impending docking. The 2 substantial rows of bilge blocks will provide stability for the ship as she settles down on the blocks. Also they will spread the bearing pressure (tons/sq ft) of the ship on the blocks. An alternative for bilge blocks for stability is to fit side shores between ship's topside and the dry dock wall. A few shores may be used for BNJ to hold her centred, supplementing or replacing the mooring lines.

Peter Navarch

Oops - wrong key again! I do not know why the "holiday" in the keel blocks forward. I have had to arrange a small gap in the keel blocks for our destroyer escort HMAS TORRENS to accommodate her retracted sonar transducer. Part of the preparation (recorded on the internet) for BNJ was to ballast her to a stern trim a little more than the slope of the blocks, to reduce the point load on the ship and aft blocks as the stern of the ship touches down. From the state in the photo, the sequence will be: - Flood the dry dock. - Open the dock gate. - Tow BNJ to the dock, and line her up with the axis of the dock. -Warp her into the dock, maintaining centreline alignment, until required fore and aft position is attained. - Close the dock gate. - Pump out water until ship touches blocks aft. - Using shores and/or lines, maintain centreline of ship along centreline of dock. - Pump out water until keel is on blocks for full length. -Dewater dock fully. - Address the cleaning and maintenance required. It is possible (likely) that when the exterior work is completed, the dock will be flooded, BNJ will be moved along half a dock block space, and redocked. Exterior work can then take place on the areas previously masked by the dock blocks. - On completion of all work, flood the dock and refloat BNJ. - Open dock gate. -Warp and tow BNJ out of dock, and back to her berth. Any queries? From your long time following Naval Architect, in Perth Western Australia. Please note that I conciosly avoid the common WA abbreviation where I expect significant USA readership, as I am aware of the existence of Washington State, where I do NOT live.

Gregg Germain

Hello Peter. Thanks for the info. What are the bilge blocks made of and how much do they weigh?

Peter Navarch

It is hard to pick up the construction of these blocks from the published night photo. Accordingly conjecture runs strong. The light elements on top will be timber capping pieces; semi-expendable. The internediate brown layer is probably timber, to give the block some softness in height against load. This supports load sharing between blocks

Peter Navarch

The lower light coloured layer is probably concrete. It is highly desirable that blocks won't float, with some substantial residual weight force when submerged without a ship on them. There sill be some significant, but undefined currents as the dock is flooded, particularly in the first few feet of water. I haven't tried the eyeball guesses on dimensions, and thus estimated weights of concrete. Try about 500 - 800 lb a block. Blocks would most likely be moved by slings from a dockside crane. My answers refer to both keel and bilge blocks, as they appear to have a common construction. Ship techie stuff. Ships are commonly built with a small slope downwards/inwards to the "flat of bottom", with bottom plating for that side lying in this slightly inclined plane. This facilitates drainage of double bottom tanks and open bilge spaces. For the IOWAs it could be around 6 - 12 inches. Bilge blocks have to be set up a little higher than their matching keel blocks to accommodate this. Further information, if required, could be obtained from the BNJ team, as the were responsible for preparing information for the ship's docking. Much of this information is, of course ship (or ship class), contained on the Docking Plan. I did prepare Docking Plans as part of my day job while I was working at Cockatoo Island, Sydney. Peter Edmonds

Peter Navarch

Western Australia Oops for all the inadvertent "end of message" creations.

Peter Navarch

The drydock had to be emptied, as shown, for the preparation of the keel and bilge blocks. Hence the photo opportunity. I would much have preferred a daylight shot. I have just noticed the 2nd short row of bilge blocks around midships in the shadows.

Dubsington

Thanks for all the interesting details, Peter! Cool stuff.