The term "Gigawatt AI training cluster" refers to a data center capable of consuming one billion watts (1 GW) of power, a massive leap from the 300 MW used by xAI's Colossus 1, built in Memphis in 122 days with 200,000 H100/H200 GPUs.

Energy usage for Colossus II could range from 1 GW continuously, translating to 24 GWh daily, depending on operational efficiency and cooling demands, far exceeding the 2.4 GWh daily of Colossus 1.

Estimates suggest Colossus II might house at least 700,000 GPUs, based on speculation of B100 chips with 1,400 kW each, surpassing the 200,000 GPUs in Colossus 1.

Compared to other clusters, Colossus II is 5 times larger than Colossus 1 in compute power and outpaces all others by a wide margin... OpenAI's and Meta's planned gigawatt-scale are years from completion.

By that time, Elon will have ridden far off into the AI sunset.

RISKS

I fear these are obvious terror targets... ultimately we need to put these centers underground - Boring Company anyone?

Sanjay is very worried about this risk.

Files

Previews only

Comments

Sol degen

My initial thoughts were the same, that it would be a target

Hobbit

That complex was put up FAST, you can tell by the photo. Those cooling units and (I think) Megapacks are strewn out in a "how can we make these fit RIGHT NOW kinda way. Serious about speed.

TheOnlyMattSmith

Definitely feel like these should be underground or heavily protected into the future......

Mr. S

You know what would be better? 1.21 gigawatts!!!!

Horsegal33

Target by who? Let's not get all paraniod now, ya'll...

3324

Does exactly what it says on the tin ….. colossus

ChicaInvesting

Is Elon the equivalent to a Peter Weyland? Where is Ms Yutani? ;)

Rising Sun

Underground cables sabotaged in the deep sea, bunker busters demolished bunkers, dug deep underground housing nukes. This requires another level of security to be hashed out.