DIY Studio Renovation 2 (Patreon)
Published:
2022-04-29 14:00:07
Imported:
2026-06
haven't archived this post yet. have a subscription? use the importer!
Content
We took away the wall of hallway next room in the middle of dismantling.
The room is a little bit bigger so that we adjusted the height of the floor.
Since the floor is done, we began on the ceiling.
Making a base for fixing the sound absorbing material.
It was very hard work because it was always facing upward. It was dizzying.
Once the sound absorbers were packed we put up the very heavy plasterboard.
The boards are two layers. They are fixed with bond and screws.
Because the beams were bent, we had to adjust them many times as we put the boards in.
This work was very hard.
We also built the foundation for the entrance.
The ceiling work is very tiring.
We have a long way to go.
Files
Previews only