THE 100 v1.1-beta1 released (Patreon)
Downloads
Missing 1 full-res photo, 1 file, as this post has not yet been imported.
Content
Dear Patreons,
after 3 months of development, I got to the point where I think that the design is stable enough for a larger group of people. Every part was tested and will be tested even further since it's part of my current daily driver I use for prototyping.
Changelog:
- New Toolhead: The toolhead was redevelop from scratch. Compared to v1.0 it's able to push about 65% more air at the critical point directly under the nozzle.
- New Feet: The new feet are able to absorb 25%-30% more force before the frame starts shaking
- Removed Rods from the back of the printer: This removed 2 linear rods from the BOM reducing the price of the printer by another 7-10$
- Clearance fix for Toolhead: The toolhead is now able to move 5-6mm more in the X-Axis
- Added allen wrench holes for X/Y-Motors
- Added Nut-Inserts to the Mainboard Mount
- Added Clamp to fix Power Cord
- Made LM8UU Exchangable
- Added Quickmounts for Z-Rods
- Bugfix: Power Supply Holder
- Added cable guides for proper cable management
Also many i've done research on the parts i've used in my v1.0 build and compared them to similar priced and even more priced parts. This will lead to a dual way BOM for the final release in August. There will be a cheap build that will be focused on 400$ (yes it will have a higher price since the war and the resulting inflation raised the prices by about 15-25%) and a "high speed" edition that will be focused somewhere around 550-700$ but here I have still a lot of research to do to find a good package.
Also i've decided to release in August a BOM with Aliexpress links, so if you plan to build the final version of the printer I would suggest to buy the parts before that official release since Im pretty sure that the prices will get a lot higher when the hype around the release started.
I will keep you informed on my work on the BOM here on Patreon but it will take me about 6-8 weeks to finish my testing of all parts (Rods testing is done by now, next step will be linear bearings, followed by different motors)
Files
Previews only