Workshop Progress! (Patreon)
Content
A bit of a spoiler for this week's video...
I know I've been pretty quiet here recently - but I've been working almost non stop on the workshop - aside from in the middle of a storm - when I decided it wasn't safe to be outside. I'm making good progress with it though - after sitting on the floor and wanting to give up!
All of the rafters are installed - and the collar ties - just the rafter ties to go (and the actual roof...) and I managed to get the window and the door installed! Almost entirely on my own - although I did need a friend to hold the door for me. The glass is in, the door has a lock - it's almost a proper building now. If proper buildings had tarpaulins for roofs...
I'd originally planned to use sheets of 18mm OSB for the roof deck - technical term, sadly not a little rooftop seating area - but they weigh 38kg a sheet, and just the thought of lifting about 20 of those onto the roof on my own made my arms hurt, so I've opted for sarking boards instead. I've still got to get 60 of them onto the roof, which is going to be a challenge... if we could have a week of dry, calm weather - that would be excellent...
I'm about to order the metal roofing sheets - I'm hoping I can get an olive green colour, I need to send some emails! In an ideal world, the metal roof goes on before the end of the month, but it depends on a) the weather and b) how long the sheets take to get here!
I hope you've had a good week!
J.