Byzantine Sundial-Calendar - Part 4 (Depthing & Planting The Train) (Patreon)
Downloads
Missing 1 full-res photo, 2 files, as this post has not yet been imported.
Content
In this video I depth & plant the gear train, and give it all a first test within the body of the mechanism. Its a key milestone in the project, and is a sort of plateau in the build process, verifying much of the previous work. There is of course still a lot of work to be done, but the finish line is in sight!
Thank you all so much for your support this year folks. You keep the lights on at Clickspring, and I very much appreciate it.
Stay safe over the holidays, and I'll catch you all in the New Year.
Cheers,
Chris.
-------- Video Notes --------
Amazon Affiliate links:
Cameras:
Panasonic GH5 - https://amzn.to/2rEzhh2
Panasonic X920 - https://amzn.to/2wzxxdT
Tools & Shop Products:
Solidworks 2013 Bible: http://amzn.to/2FObS1D
Dykem 80300 Steel Blue Layout Fluid, Brush-in-Cap (4oz): http://amzn.to/2HGPaJJ
Tix Solder: http://amzn.to/2G4lUiE
Tix Flux 1/2oz: http://amzn.to/2G85OEZ
Optivisor Headband Magnifier: http://amzn.to/2HFg1FU
Files
Previews only