Home Creators Posts Import Register Favorites Logout

Content

Day four (usually day three!) of load in, with yet another large truck stuffed to the ceiling with heavy flight cases. Lots of lights, truss and power distribution equipment.

Long heavy day, and another one tomorrow as we position, connect and program the last of the lights. Then the job should get a lot easier.

This is by far the hardest part of a job like this. Even the load-out after the show run has completed is much easier than the load-in. My hands are sore, my back is sore and I'm sleeping as soon as my head hits the pillow. Welcome to the glamour of showbiz.

Programming of the lighting starts next week.

https://youtube.com/shorts/J53w_2pztn4

Files

Another backstage snippet with toilet-cam

Third truck stuffed with lights truss and power distribution equipment. A very long day, but just about everything is now in place and just needing the last bit of wiring and programming. The first few days of this job are heavy going, but after that it gets a lot easier, and even the load-out after the show has finished is easy compared to this part.

Comments

Brian Deschene

Well, BC is always one to provide all the details. :-)

Adam McKnight

A fulfilling shite after a fulfilling days work

Paul Burgess

Many years ago I used to work on the sound side of gigs and bringing in the system in the flight cases was hard work for a few hours then the same again a few hours later loading up so know where your coming from.

Frank

Post that sh!t.

Keith Who

You always look “pretty” but pretty what? ❤️

Stephen Eyles

Ooh poor hands!! 😢wouldn't gloves help look after em? You've only got one set..

Hughek

Load in-load out!

Big Clive

I wear gloves while manhandling flight cases in the back of the truck, but they get in the way for most other stuff.