Work update (Patreon)
Published:
2026-07-26 03:14:47
Edited:
2026-07-26 03:29:25
Imported:
2026-11
Content
The load-in of the lighting for the show (Royal Edinburgh Military Tattoo) is mostly complete with just a few small tasks remaining for extra features.
That means the pressure is off, and I'm actually getting a day off (Sunday). The lighting designer and desk programmer arrive on Monday, so we'll set up the on-arena lighting equipment once the castle is closed to the public. (It gets removed from the public areas during the day.)
The bulk of the load in was dry with just a little rain at the end, which is a good result. It's been hammering with rain tonight, so that should help us find any potential waterproofing issues. The lights themselves are mostly rated for outdoor use.