Home Creators Posts Import Register Favorites Logout

Content

Hi everyone,

I hope you’re all doing well.

A major part of the current arc has been building the towers on top of the three dunes around Sombra. So far, I’ve focused mostly on the towers themselves, but the weapons installed at the top are another essential part of the project.

As I worked on the arc’s resolution, I realized that this problem needed more setup in the earlier chapters. I’ve therefore added a few passages explaining what the weapons require, why the Ogres can’t build them themselves, and how Jack plans to get them.

For those of you who have already read these chapters, here are the additions so you don’t have to go back through them.

Chapter 14 — The first mention of the weapons

When Amari asks whether the defenses can be finished in six days, Jack now brings up the weapons as another obstacle:

Amari drew in a slow breath. “I need to ask you something, Jack. Do you think it’s possible to finish the city’s defenses in six days?”

“Six days, huh?” Jack thought for a moment. “To be honest, I have no idea. The masons have already started working on the foundation of the towers, but building on dunes is something I have zero experience with. Just getting through enough sand to reach a stable foundation could take a long time. And not to speak of the weapons that go on top. Maybe after I finish one of the towers, I’ll be able to give you a better timeline.”

Chapter 19 — The blueprints and crafting requirements

As Jack heads up the dune to check on construction, he reviews the tower blueprints and the requirements for their weapons:

He opened the Star Tower blueprint. A projection appeared before him, showing a tower just like those the system had added during the Breach. He switched to the Moon Tower, then the Sun Tower. The same tall brick shaft. The same internal spiral staircase and fortified entrance at ground level. He switched back to the Star Tower. Only the mechanism at the top changed.

The Goat Produce Shop had needed butchering knives, a table, and cheesemaking equipment. The Desert Barracks had required wooden weapons and a furnished office. These towers needed their siege weapons before the system would recognize them as specialty buildings.

Jack checked the name of the weapon that had to go on top. He then opened the web browser and searched for “New Earth Machine Gun Arrow Shooter.” The recipe required Master Carpentry, level 5, with the Siege Engineering specialization, plus Journeyman Tinkering.

Cain is Master level 6. But he doesn’t have Tinkering. He chose the Furniture specialization too. Tsk.

He checked the Heavy Javelin Ballista required for the Moon Tower. Master Carpentry, level 3, again with the Siege Engineering specialization. A little easier to make, but still out of reach. The Sun Tower’s flame mechanism, something called the Rotary Burning Oil Sprayer, required a Grandmaster Chemist with a Tinkering Minor. No one in the guild could make these.

If only I could go to Eternia and buy them…

Too bad this kind of weaponry couldn’t be carried in an inventory. They’d have to hire someone to assemble the mechanisms in Sombra or haul the finished weapons all the way across the desert. He would have loved to make knockoff versions using his Handyman cheat skills, but the stringent requirements of specialty-building blueprints wouldn’t allow that.

He searched for sellers. Nothing for any of the three weapons. Siege weapons were the business of large guilds, which had their own connections. For now, he could only hope BlueFire would find specialists willing to travel to Sombra and build them.

He had to focus on the problem he could solve himself: the foundations. It was time to see if the plan he’d devised with Holly was working.

Chapter 23 — An unsuccessful request for help

When Jack checks his messages after getting some sleep, he now receives an answer from Professor Masse:

Professor Masse had also gotten back to him.

“Hi Jack. The Krakens do have three Carpenters with the Siege Engineering specialization, but they’re guild exclusive. I’ve talked to my guild leader, and he says he can’t spare any of them. Says that you having the only Gold-tier in the village is enough of an advantage. I’m sorry. I tried.”

Jack sighed. That had been worth a shot. But it looked like the number one guild in the game wasn’t willing to help them bolster their defenses, even if they were at opposite ends of the map.

Looks like I have no choice but to rely on BlueFire for this one.

Chapter 29 — Hire — BlueFire finds a Siege Engineer

When Jack returns to the northern dune and meets BlueFire, they now discuss an offer from the Griffons:

“I have some news for you. I found a Siege Engineer.”

Jack put a hand over his chest and let out a deep breath. “You did?”

BlueFire nodded. “A guy who works for the Griffons.”

Jack thought back to the Pheromoner shadowed by the tall, black-armored warrior he’d seen talking to Ogre at the HQ. They were the fourth most powerful guild in the game, if memory served him. It made sense they’d have a Siege Engineer. And to top that off, they were on the Ogres’ list of allies. “Which design can they build?”

“The ballistae,” BlueFire said.

Jack bit his lip. He’d have preferred the arrow shooter, but he was willing to take anything right now.

“How much?” Jack asked, almost afraid to hear the answer.

“Ten thousand gold apiece.”

“Materials included?”

BlueFire nodded.

Jack sighed. “It could be worse.”

“It’s a very reasonable price. And given how much you’re making in taxes, it seems like a manageable expense for you,” BlueFire said, stressing the last word. “So, shall I tell them you’re interested?”

Jack had considered asking the Ogres to chip in, but apparently that wasn’t going to happen. He supposed it was fair, given that they didn’t take a share of the village’s tax income.

“Just give me a moment,” Jack said.

He messaged his teammates about the cost. One by one, they replied, agreeing to it. Rob suggested paying for the weapons out of the village’s tax revenue. By the time payment was due, they should have just enough in the coffers.

“Go ahead. Tell the Griffons we’ll take the deal,” Jack finally said.

At least they had a way to arm the towers once they were finished. Now he needed to make sure there were towers to put them on.

Chapter 31 — Restoring — Maintaining siege weapons

I’ve also added a small detail to the Restoring guide, mentioning the demand for players who can repair siege engines:

Regarding Major synergies, Smithing and Chemistry are the two best matches. Smithing lets you work with solder and metal braces, while Chemistry provides adhesives and other chemicals that recover some of an item’s Durability. Carpentry is a close third. Guilds are always on the lookout for Restorers who can repair their siege engines.

Chapter 36 — Buried — A reminder about the Griffons’ engineer

When Jack sees the allied players who came to help defend Sombra, he now briefly wonders whether their Siege Engineer is among them:

Jack recognized the tall man and woman from the Griffons. They’d brought twenty other members of their guild to help. He scanned the group, wondering which of them, if any, was the Siege Engineer who would build the ballistae, but soon gave up.

These additions should give the weapons a clearer place in the arc before we reach its resolution. I'll update all individual chapters throughout the week.

Let me know what you think of the changes down in the comment.

Thank you all for reading!

Cássio

Comments

ByLAWphoto

Just a small thing I noticed... Instead of calling it a gold tier village, it's a gold tier in the village. I think you meant it's the only gold tier village in the game. "Chapter 23 — An unsuccessful request for help When Jack checks his messages after getting some sleep, he now receives an answer from Professor Masse: Professor Masse had also gotten back to him. “Hi Jack. The Krakens do have three Carpenters with the Siege Engineering specialization, but they’re guild exclusive. I’ve talked to my guild leader, and he says he can’t spare any of them. Says that you having the only Gold-tier in the village is enough of an advantage."

BullDurham

Suspect you found it before this. Ch 20 – Colaboration is misspelled. Should be Collaboration. We’re retired, so I can’t afford to upgrade, so this probably is too late. But I check every day to make sure I read the next chapter as soon as it’s open to Free. Count me in the group that doesn’t think you should end “Handyman” any time soon!

William Farnham

So just catching up with posts. I had a cool thought while you've stated the breach specialty buildings can't be janked by handyman to be approved by the system you've also previously said that along as an inventer has 1 of the skills involved in a blueprint they can modify it. Holly could use the blueprints for the breach towers as reference material for additional installations, imagine combining the arrow weapon with the batista, instead of rapid fire arrows it could be auto loading wall mounted batista for increased rate of fire. Or the machine gun arrow launcher being converted to smaller turrets mounted on the walls. Love to see the basilisks try to walk into that...

Dave_S

Nice adds!

Daniel Creviston

Looking forward to this and to see how Basilisk tries to tackle things! I'm loving how the series has connections to your other works. Dakota Krout has a couple of his books in The Completionist Chronicles dedicated to tower defense and beast waves (much later in the series). Really excited to see how this plays out for The Jack Pack.