Home Creators Posts Import Register Favorites Logout
haven't archived this post yet. have a subscription? use the importer!

Downloads

  • 209420291.mp4

Missing 1 video, as this post has not yet been imported.

Content

Further process in the direct drive implementation! I was able to build all the toolhead mounts for:

- CHC
- CHC Pro
- Phaetus Rapido HF
- Phaetus Rapido UHF
- Mosquito Magnum+
- vzBot Goliath Air


Im not sure if the Goliath makes the cut since it's small heatsink might cause overheating issues since there is not much room for the hot air to move.

But overall im happy.

The plan is to start testing my PLA version of the extruder at the beginning of next week. Also I've ordered a SLS HP-PA-12 version at a printing service to for a comparison.

Comments

Duncan Meyer

Your new DD toolhead is looking awesome. I'm assuming the different hotends just require a different mount? The extruder remains unchanged? Another question: What about heat buildup in the stepper? Seems that all that close-fitting plastic is going to store a lot of heat?

The100

Correct, it should be also compatible to other Hotends. I've for a handful of hotends so chances are height that mods for the extruder also work without changes on the extruder itself

Endre Olasz

When can we will test the new direct toolhead?

The100

That's a good question, the design of the extruder ist complete but it wont fit into a v1 or v1.1 construction since many things changed that need changes on other parts. So there is a ripple effect that will cause almost every part has to be changed. My plan is to have everything ready until September/October for alpha testing and November/Dezember for beta testing. If everything went like planned the V2 of the printer will be ready by March 24

Duncan Meyer

Do I understand you correctly - the new direct drive toolhead won't be available until Sept at the earliest?

The100

Yeah it's my first prototype, extruders are complex, finding the perfect distances between the gears, guiding the filament properly without stucking, being able to absorb the forces that will occur on the extruder, thats a lot of work. And I have to do it for PLA and for Nylon, so there are still 200-300 hours of work until it reaches a point where im able to release the part for my patreons. For me it's important that every part that I release here has a certain quality standard, so if Im not convinced that it will improve the printer I wont release it. Other than that even if the extruder is ready in september it wont fit on the V1.1 construction. To be able to use the extruder the distance between the X-Rods will change, which will change the Y-Carriage since otherwise there wont be enough room, to change this the holder for the Y-Axis will be different, which means the whole Top frame will change, speaking of changes of the top frame, I want to give the people an option to use side blowing 120mm fans. The fanducts will be part of the top frame... so tldr; there will be a ripple effect on most parts of the top frame. I expect that the development of the V2 top frame could be done until december this year but we will see

Duncan Meyer

Thanks for the clarification mate. I completely understand. I spent the day examining the knock-on effects of increasing the X-carriage rods to accommodate the stepper motor. There are so many changes which then have to be made - it's a huge job. I think I'll stick with the bowden tube option for now, but use my new print head which has no cooling fan or ducts.